Air Traffic Control System Command Center

ATCSCC Home | Products | What's New | Site Map | ATCSCC FAQ | Diversion Forums | Text-Only Version
ATCSCC Advisory
ATCSCC ADVZY 001 DCC 02/02/2026 OPERATIONS PLAN

RAW TEXT: 

EVENT TIME: 02/0100 - AND LATER
____________________________________________________________________


THE MCO GROUND STOP HAS BEEN CANCELLED AND THEY HAVE RESUMED NORMAL
OPERATIONS. THE DELAY PROGRAM FOR DCA HAS BEEN PURGED. STAFFING
TRIGGERS HAVE BEEN PUBLISHED FOR BOTH ZJX AND ZAB. THE SERMN NORTH
WAS PUBLISHED DUE TO VOLUME AND HAS EXPIRED. THE
FCA002:PHX_NO_EAGUL_PARTIAL HAS BEEN PUBLISHED DUE TO ZAB STAFFING.

FOR TOMORROW - TOMORROW HAS BEEN IDENTIFIED AS A MODERATE SNOWBIRD
VOLUME DAY WITH ROUTE STRUCTURE POSSIBLE. CDRs ARE PROBABLE DUE TO
STRATOLAUNCH MISSION. TERMINAL INITIATIVES ARE POSSIBLE FOR SAN AND
SFO DUE TO FORECAST LOW CEILINGS. EWR IS IN THE PLAN DUE TO
UNFAVORABLE WIND. DCA IS IN THE PLAN DUE TO SNOW/ICE ON THE AIRPORT
SURFACE. PHL HAS A SCHEDULED FLIGHT CHECK AFTER 0500Z TOMORROW
EVENING.
____________________________________________________________________


STAFFING TRIGGER(S):
UNTIL 0400Z	ZJX CENTRAL AREA
UNTIL 0500Z	ZAB NORTH AREA
UNTIL 0700Z	SFO ATCT 

TERMINAL CONSTRAINTS:
BOS/N90/PHL/PCT - WIND
DTW/C90 - SNOW
SEA/SFO/SCT - LOW CEILINGS/LOW VISIBILITY
MIA - TFDM IMPLENTATION UNTIL 02/17/26 359Z
SDL - WASTE MANAGEMENT GOLF OPEN UNTIL 02/09/26 2359Z

TERMINAL ACTIVE:
NONE

TERMINAL PLANNED:
AFTER 1400	-SAN GROUND STOP POSSIBLE
AFTER 1630	-SFO GROUND STOP/DELAY PROGRAM POSSIBLE
AFTER 1700	-DCA GROUND STOP/DELAY PROGRAM POSSIBLE
AFTER 1900	-EWR GROUND STOP/DELAY PROGRAM POSSIBLE

EN ROUTE CONSTRAINTS:
NAS - MODERATE SNOWBIRD VOLUME
ZAB - STRATOLAUNCH WSMR MISSION 1430Z-1900Z
ZDC - NRP SUSPENSION THROUGH 02/28/2026
ZMA - MILITARY OPS AVON PARK

EN ROUTE ACTIVE:
UNTIL 0400	-FCA002:PHX_NO_EAGUL_PARTIAL

EN ROUTE PLANNED:
AFTER 1000	-LAKE ERIE PARTIAL PROBABLE
AFTER 1100	-SNOWBIRD ROUTE STRUCTURE POSSIBLE
AFTER 1300	-PHX CDRS PROBABLE
AFTER 1900	-LAKE ERIE ROUTES POSSIBLE

CDRS/SWAP/CAPPING/TUNNELING/HOTLINE/DIVERSION RECOVERY:
NONE

RUNWAY/EQUIPMENT/POSSIBLE SYSTEM IMPACT REPORTS(SIRs):
TEB - RWY 06/24 CLOSED 1230Z-1700Z
ORD - UAL RAMP RECONFIG TAXIWAY A CLOSURE UNTIL 02/02/26 2359Z
TPA - RWY 01R/19L CLOSED UNTIL 2/13/26 2200Z
LGA - RWY 04/22 AND TWYs CLOSURES UNTIL 02/21/26 0000Z
SAN - PHASE 5.1 CONSTRUCTION UNTIL 02/22/26 0759Z
SAT - RWY 13L/31R AND 13R/31L CLOSED UNTIL 3/06/26 0600Z
CLT - WEST RAMP EXPANSION UNTIL 04/15/26 1100Z
DTW - RWY 27L/09R SHORTENED TO 6,780' UNTIL 04/19/27 0400Z
DFW - TXY G CLOSURE UNTIL 4/30/26 0500Z
ABQ - RWY 03/21 CLOSED UNTIL 05/14/26 2359Z
ORD - RWY 9L EGPWS ALERT UNTIL 07/17/26 2359Z
BNA - RWY 13/31 CLOSURE FOR TWY A RECONSTRUCTION UNTIL 08/06/26
DCA - OPERATIONAL READJUSTMENT UNTIL 10/31/26 2359Z

AIRSPACE FLOW PROGRAM(S) ACTIVE:
NONE

AIRSPACE FLOW PROGRAM(S) PLANNED:
NONE

PLANNED LAUNCH/REENTRY:
SPACEX STARLINK 17-32, VANDENBERG SFB, CA
PRIMARY:	02/02/26	1517Z-2000Z
BACKUP:		02/03/26	1517Z-2000Z

SPACEX STARLINK 6-103, CAPE CANAVERAL SFS, FL
PRIMARY:	02/03/26	2212Z-0255Z
BACKUP:		02/04/26	2146Z-0229Z

SPACEX STARLINK 17-33, VANDENBERG SFB, CA
PRIMARY:	02/06/26	1705Z-2148Z
BACKUP:		02/07/26	1705Z-2148Z

NASA ARTEMIS-II, KENNEDY SPACE CENTER, FL
PRIMARY:	02/07/26	0241Z-0626Z
BACKUP:		02/08/26	0346Z-0731Z

SPACEX STARLINK 6-104, CAPE CANAVERAL SFS, FL
PRIMARY:	02/07/26	0941Z-1424Z
BACKUP:		02/08/26	1046Z-1529Z

FLIGHT CHECK(S):
AFTER 03/0500	-PHL

VIP MOVEMENT(S):
NONE

NEXT PLANNING WEBINAR: 1215Z
020020-021059
26/02/02 00:20  DCCOPS.lxstn35