Air Traffic Control System Command Center

ATCSCC Home | Products | What's New | Site Map | ATCSCC FAQ | Diversion Forums | Text-Only Version
ATCSCC Advisory
ATCSCC ADVZY 028 DCC 01/27/2026 OPERATIONS PLAN

RAW TEXT: 

EVENT TIME: 27/1100 - AND LATER
____________________________________________________________________

WESTERLY GUSTS FORECAST IN THE TAF FOR THE NEW YORK AND BOSTON
TERMINALS, WITH UPDATES APPENDED TO THE NEW YORK MARKET WITH SNOW
BEGINNING AT 1800Z (NWS PROB 30). INITIATIVES ARE NOT PLANNED FOR
LGA AND JFK, AS VOLUME OBSERVED REMAINS WITHIN THE ACCEPTABLE RANGE
OF MIT MITIGATION IF REQUIRED. TO THE WEST, SFO TAF WIND DATA CITES
VELOCITIES ABOVE 10 KNOTS WITH FAVORABLE CEILINGS; WITH THE LOOMING
SOUTH OPERATION THE DELAY PROGRAM REFERENCE REMAINS.
____________________________________________________________________

STAFFING TRIGGER(S):
NONE

TERMINAL CONSTRAINTS:
BOS/N90/EWR - WIND
DTW/C90 - SN

TERMINAL ACTIVE:
NONE

TERMINAL PLANNED:
AFTER 1800	-SFO GROUND STOP/DELAY PROGRAM POSSIBLE
AFTER 1900	-EWR/TEB GROUND STOP/DELAY PROGRAM POSSIBLE

EN ROUTE CONSTRAINTS:
ZDC - NRP SUSPENSION THROUGH 02/28/2026
ZDC - QVR OTS 1300Z-2100Z
ZJX - SENTRY SAV 1400Z-2200Z
ZJX - EGLIN WATER TEST 1930Z-2230Z
ZMA - T6 TRAINING AVON PARK
ZHN - SENTRY ALOHA EXERCISE 1730Z-0300Z

EN ROUTE ACTIVE:
NONE

EN ROUTE PLANNED:
AFTER 1930	-EGLIN WATER TEST ROUTES EXPECTED
AFTER 2000	-SENTRY MAYHEM NORTHBOUND ROUTES EXPECTED
AFTER 2000	-SENTRY MAYHEM SOUTHBOUND ROUTES EXPECTED

CDRS/SWAP/CAPPING/TUNNELING/HOTLINE/DIVERSION RECOVERY:
NONE

RUNWAY/EQUIPMENT/POSSIBLE SYSTEM IMPACT REPORTS(SIRs):
ORD - UAL RAMP RECONFIG TAXIWAY A CLOSURE UNTIL 02/02/26 2359Z
TPA - RWY 01R/19L CLOSED UNTIL 2/13/26 2200Z
SAN - PHASE 5.1 CONSTRUCTION UNTIL 02/22/26 0759Z
SAT - RWY 13L/31R AND 13R/31L CLOSED UNTIL 3/06/26 0600Z
CLT - WEST RAMP EXPANSION UNTIL 04/15/26 1100Z
DTW - RWY 27L/09R SHORTENED TO 6,780' UNTIL 04/19/27 0400Z
DFW - TXY G CLOSURE UNTIL 4/30/26 0500Z
ABQ - RWY 03/21 CLOSED UNTIL 05/14/26 2359Z
ORD - RWY 9L EGPWS ALERT UNTIL 07/17/26 2359Z
BNA - RWY 13/31 CLOSURE FOR TWY A RECONSTRUCTION UNTIL 08/06/26
DCA - OPERATIONAL READJUSTMENT UNTIL 10/31/26 2359Z

AIRSPACE FLOW PROGRAM(S) ACTIVE:
NONE

AIRSPACE FLOW PROGRAM(S) PLANNED:
NONE

PLANNED LAUNCH/REENTRY:
SPACEX GPSIII-9, CAPE CANAVERAL SFS, FL
PRIMARY:	01/28/26	0430Z-0548Z
BACKUP:		01/29/26	0426Z-0544Z

SPACEX STARLINK 17-19, VANDENBERG SFB, CA
PRIMARY:	01/29/26	1517Z-2000Z
BACKUP:		01/30/26	1517Z-2000Z

SPACEX STARLINK 6-101, CAPE CANAVERAL SFS, FL
PRIMARY:	01/30/26	0400Z-0843Z
BACKUP:		01/31/26	0122Z-0605Z

SPACEX STARLINK 6-103, CAPE CANAVERAL SFS, FL
PRIMARY:	02/01/26	2304Z-0347Z
BACKUP:		02/03/26	1115Z-1558Z

SPACEX STARLINK 17-32, VANDENBERG SFB, CA
PRIMARY:	02/02/26	1517Z-2000Z
BACKUP:		02/03/26	1517Z-2000Z

FLIGHT CHECK(S):
AFTER 1700	-ATL
AFTER 2100	-SEA
AFTER 0400	-DTW
AFTER 0500	-MIA
AFTER 0600	-MIA

VIP MOVEMENT(S):
AFTER 1700	-DEP ADW	AFTER 1900     -ARR DSM
AFTER 2200	-DEP DSM	AFTER 0000     -ARR ADW

NEXT PLANNING WEBINAR: 1215Z
271018-271259
26/01/27 10:18  DCCOPS.lxstn35