|
RAW TEXT:
|
EVENT TIME: 26/0300 - AND LATER
____________________________________________________________________
BNA AND MEM ATCTs WILL BE ATC ZERO DURING THE OVERNIGHT HOURS. AUS
GDP WAS PURGED.
POSSIBLE TERMINAL INITIATIVES FOR BOS TOMORROW MORNING FOR RUNWAY
TREATMENTS AND SNOW REMOVAL. LGA AND JFK MAY NEED GROUND STOPS IN
THE MORNING DUE TO RUNWAY TREATMENTS AND SNOW REMOVAL. INITIALLY IN
THE MORNING PHL/EWR/TEB MAY NEED GROUND STOPS FOR RUNWAY TREATMENTS
AND SNOW REMOVAL. LATER IN THE DAY EWR IS IN THE PLAN FOR TERMINAL
INITIATIVES TO DUE WIND AND VOLUME. POSSIBLE TERMINAL INITIATIVES
FOR IAD DUE TO WIND AND VOLUME AFTER 1500Z. AR/Y, OCEANIC, AND GULF
ROUTE CLOSURES ARE POSSIBLE FOR THUNDERSTORMS. ROUTES MAY BE NEEDED
IN THE AFTERNOON FOR MILITARY ACTIVITY IN THE ATLANTIC.
CAPPING/TUNNELING AND REGIONAL ROUTES FOR ZJX MAY BE NEEDED FOR
VOLUME. A ROCKED LAUNCH IS SCHEDULED FOR TOMORROW EVENING WITH
ROUTES ANTICIPATED. A DFW REGIONAL PLANNING DISCUSSION WAS ADDED IN
THE MORNING AT 1115Z.
____________________________________________________________________
STAFFING TRIGGER(S):
UNTIL 0400 -F11 TRACON
UNTIL 0400 -ZFW RDR AREA
UNTIL 0400 -DFW ATCT
UNTIL 0800 -BNA ATCT
TERMINAL CONSTRAINTS:
BOS - SNOW/LOW CIGS/LOW VIS/WIND
N90/PHL - AM SNOW/FZRA, LOW CIGS, PM WIND
PCT - LOW CIGS/WIND
DTW - SNOW
CLT - LOW CIGS
TERMINAL ACTIVE:
UNTIL 0559 -DFW GROUND DELAY PROGRAM
TERMINAL PLANNED:
AFTER 1100 -BOS GROUND STOP/DELAY PROGRAM POSSIBLE
AFTER 1100 -LGA/JFK GROUND STOP POSSIBLE
AFTER 1100 -PHL/EWR/TEB GROUND STOP POSSIBLE
AFTER 1500 -IAD GROUND STOP/DELAY PROGRAM POSSIBLE
EN ROUTE CONSTRAINTS:
ZNY/ZDC/ZJX/ZMA/ZHU - TSTMS
ZDC - NRP SUSPENSION THROUGH 02/28/2026
ZHN - SENTRY ALOHA EXERCISE
EN ROUTE ACTIVE:
UNTIL 0200 -FLORIDA_TO_NE_3_PARTIAL
UNTIL 0200 -N90_PREF_ROUTES
UNTIL 0200 -TEXAS_AND_ZME_TO_ZBW
UNTIL 0400 -FCA013:DFW_BOOVE_PARTIAL
EN ROUTE PLANNED:
AFTER 1100 -AR/Y ROUTE CLOSURES POSSIBLE
AFTER 1200 -OCEANIC ROUTE CLOSURES POSSIBLE
AFTER 1300 -GULF ROUTE CLOSURES POSSIBLE
AFTER 1400 -ZJX CAPPING/TUNNELING POSSIBLE
AFTER 1400 -ZJX REGIONAL ROUTES POSSIBLE
AFTER 1630 -SENTRY MAYHEM NB/SB POSSIBLE
AFTER 0349 -NO AR/Y ROUTES TO MCO/TPA/RSW AREAS
CDRS/SWAP/CAPPING/TUNNELING/HOTLINE/DIVERSION RECOVERY:
UNTIL 0400 -ATL/CLT CDRS
UNTIL 0400 -DFW DIVERSION RECOVERY
UNTIL 0400 -ZHU SWAP STATEMENT
RUNWAY/EQUIPMENT/POSSIBLE SYSTEM IMPACT REPORTS(SIRs):
TYS - RWY 5R/23L CLOSED UNTIL 1/30/26 2359
ORD - UAL RAMP RECONFIG TAXIWAY A CLOSURE UNTIL 02/02/26 2359Z
TPA - RWY 01R/19L CLOSED UNTIL 2/13/26 2200Z
SAN - PHASE 5.1 CONSTRUCTION UNTIL 02/22/26 0759Z
SAT - RWY 13L/31R AND 13R/31L CLOSED UNTIL 3/06/26 0600Z
CLT - WEST RAMP EXPANSION UNTIL 04/15/26 1100Z
DTW - RWY 27L/09R SHORTENED TO 6,780' UNTIL 04/19/27 0400Z
DFW - TXY G CLOSURE UNTIL 4/30/26 0500Z
ABQ - RWY 03/21 CLOSED UNTIL 05/14/26 2359Z
ORD - RWY 9L EGPWS ALERT UNTIL 07/17/26 2359Z
TUS - RWY 11R/29L CLOSED UNTIL 07/24/26 2359Z
BNA - RWY 13/31 CLOSURE FOR TWY A RECONSTRUCTION UNTIL 08/06/26
DCA - OPERATIONAL READJUSTMENT UNTIL 10/31/26 2359Z
LNK - RWY 18/36 CLOSED FOR CONSTRUCTION UNTIL 11/23/26
AIRSPACE FLOW PROGRAM(S) ACTIVE:
NONE
AIRSPACE FLOW PROGRAM(S) PLANNED:
NONE
PLANNED LAUNCH/REENTRY:
SPACEX GPSIII-9, CAPE CANAVERAL SFS, FL
PRIMARY: 01/27/26 0434Z-0552Z
BACKUP: 01/28/26 0430Z-0548Z
SPACEX STARLINK 6-101, CAPE CANAVERAL SFS, FL
PRIMARY: 01/29/26 0214Z-0657Z
BACKUP: 01/30/26 0148Z-0631Z
FLIGHT CHECK(S):
27/0400 -DTW RWY04R ILS PERIODIC W/ MONITORS
VIP MOVEMENT(S):
NONE
DFW REGIONAL PLANNING DISCUSSION: 1115Z
NEXT PLANNING WEBINAR: 1215Z
260245-261059
26/01/26 02:45 DCCOPS.lxstn35
|