Air Traffic Control System Command Center

ATCSCC Home | Products | What's New | Site Map | ATCSCC FAQ | Diversion Forums | Text-Only Version
ATCSCC Advisory
ATCSCC ADVZY 058 DCC 08/23/2015 OPERATIONS PLAN

RAW TEXT: 

ATCSCC  ADVZY 058 DCC 08/23/15 OPERATIONS PLAN
VALID 1800Z AND LATER

TERMINAL CONSTRAINTS:
BOS/SFO/LAX-CIGS
DTW-TSRA
MCO/TPA/MIA/ORD-VCTS
DEN/SLC/SEA-SMOKE
DTW-RWY 03R/21L, 09L/27R CLOSED
JFK-RWY 04L/22R CLOSED
LAX-RWY 06L/24R CLOSED
SEA-RWY 16C/34C CLOSED
DEN-RWY 17L/35R CLOSED

EN ROUTE CONSTRAINTS:
ZTL/ZAU/ZMP/ZKC/ZME/ZFW-TSTMS

ZAU IS EXPERIENCING IMPACTS TO ORD ARRIVALS FROM THE NORTHEAST AND
SOUTHEAST. STRUCTURED ROUTES ADDED TO HELP MANAGE. A WESTBOUND CAN
ROUTE WAS ADDED FROM ZBW AND JFK TO THE PACNW. THE DFW STRUCTURED
ROUTINGS WILL EXPIRE AT 1800, AS WELL AS, THE ATL STRUCTURE FROM THE
SOUTHEAST. THE POSSIBILITY OF A N0 J42 2 WAS REMOVED FROM THE PLAN.
BOS GDP WAS ADDED TO THE PLAN. ORD IS CURRENTLY IN A 1ST TIER GROUND
STOP AND THAT IS NOT EXPECTED TO BE EXTENDED. THE POSSIBILITY OF A
MSP GDP WAS ADDED TO THE PLAN. 

1. ROUTES
UNTIL 1900	-ZNY ZBW TO ORD
UNTIL 2000	-S TO ORD
UNTIL 2100	-NE TO ORD
UNTIL 0059	-MARTHAS VINEYARD ROUTE NELIE
UNTIL 0100	-CAN YQT WEST 1 MODIFIED-ZBW
UNTIL 0430	-JFK/EWR WIND ROUTES

PLANNED ROUTES:
AFTER 1900	-DTW ARRIVAL ROUTES POSSIBLE

2. ZBW
UNTIL 0359	-BOS GROUND DELAY PROGRAM 

3. ZOB
AFTER 2200	-DTW GROUND STOPS POSSIBLE

4. ZMP
AFTER 2230	-MSP GROUND DELAY PROGRAM POSSIBLE

5. ZSE
AFTER 1600	-SEA GROUND DELAY PROGRAM 

6. ZOA
UNTIL 1859	-SFO GROUND DELAY PROGRAM

NEXT PLANNING TELCON: 1915z
231745-231959
15/08/23 17:47  DCCOPS./nfs/lxstn35