RAW TEXT: |
ATCSCC ADVZY 011 DCC 11/24/14 OPERATIONS PLAN
VALID 0300Z AND LATER
TERMINAL CONSTRAINTS:
BOS/NY/PHL/DC/DTW-WIND/CIGS/RA
MCO/TPA-CIGS/VSBY
CLT-EQ/CIGS/WIND
ATL-CIGS/WIND
ORD/MDW-WIND/CIGS/-RA/-SN
MSP-WIND/CIGS/-SHSN
DFW-WIND
LAS-RWY 25R/07L CLSD UNTIL 04/2015
EN ROUTE CONSTRAINTS:
ZDC/ZJX/ZTL-TSTMS
1. ROUTES
UNTIL 0430 -EWR/JFK WIND ROUTES
NEXT DAY OUTLOOK: LOW CEILINGS, WIND, AND RAIN ARE FORECAST IN
BOS/NY/PHL/DC/DTW; GROUND STOPS AND/OR DELAY PROGRAMS ARE PROBABLE
AFTER 1200Z IN LGA, AFTER 1300Z IN PHL, AND AFTER 1100Z IN DCA. DUE
TO CLT'S ILS RUNWAY 18R OUTAGE AND FORECAST LOW IFR, A GROUND DELAY
PROGRAM IS POSSIBLE AFTER 1300Z. IF THE ILS IS REPAIRED, THEN
METERING DELAYS CAN BE ANTICIPATED FOR THEIR FIRST ARRIVAL BANK.
METERING DELAYS IN THE 45 MINUTE RANGE ARE POSSIBLE IN ATL AFTER
1300Z DUE TO FORECAST LOW CEILINGS. LOW CEILINGS AND RA/SHSN ARE
FORECAST IN ORD/MDW/MSP BUT NOT EXPECTING SIGNIFICANT IMPACT EARLY
MORNING.
NEXT PLANNING TELCON: 1215Z
240245-241059
14/11/24 02:45 DCCOPS./nfs/lxstn35 |